Dariali Energy JSC
Dariali HPP
Water from the Tergi river is diverted at the headworks and travels through a headrace tunnel to an underground powerhouse at 1,334 m. There, high-pressure jets strike the buckets of three Pelton turbines, which drive the generators.

From river to grid
- 01Headworks
- 02Headrace tunnel
- 03Penstock
- 04Pelton turbines
- 05Generators
- 06Grid
Placeholder text — to be replaced with final content.
The plant in numbers
108MWInstalled capacity
~500GWhAverage annual generation
3Pelton turbine units
1,334mPowerhouse elevation