Dariali Energy JSC

Dariali HPP

Water from the Tergi river is diverted at the headworks and travels through a headrace tunnel to an underground powerhouse at 1,334 m. There, high-pressure jets strike the buckets of three Pelton turbines, which drive the generators.

Underground powerhouse hall with three generator units

From river to grid

  1. 01Headworks
  2. 02Headrace tunnel
  3. 03Penstock
  4. 04Pelton turbines
  5. 05Generators
  6. 06Grid

Placeholder text — to be replaced with final content.

The plant in numbers
108MWInstalled capacity
~500GWhAverage annual generation
3Pelton turbine units
1,334mPowerhouse elevation